200 m3 per day city waste POWER PLANT 10 MW
浜田ボイラーの流動床は媒体となるシリカ砂が常時循環します。 この技術を都市ごみ燃焼に応用して中国杭州にある200m3毎日処理能力の10MW発電ボイラーを 杭州の錦江企業グループと合同研究で開発いたしました。右下の写真の前列左が錦江企業グループの総師、Mr. Dou Zheng Gang, 後列左が浜田ボイラーの浜田和宏会長です。
Boiler
1st power plant of city waste was built in 1997 in Hangzhou

City garbage waste are collected to be used for power plant
Boiler
At the back of the boiler, environmental equipment
Boiler
City waste Fired CFBC Boiler of 50 ton/h 52 bar 400 oC superheated steam
Boiler
Turbine of 10 MW made in by Hangzhou Turbine Works (technical assistance from SIEMENS)
Boiler
Mr. K. Hamada of Hamada Boiler (left back row) posing with Jinjiang Group of Hangzhou (front left) discussing project to expand City Waste power Plant in many privinces of China