![Boiler](/images/PLANT-1.jpg)
1st power plant of city waste was built in 1997 in Hangzhou |
![](/images/100-0076_sta_2.jpg)
City garbage waste are collected to be used for power plant |
![Boiler](/images/citiwaste-2.jpg)
At the back of the boiler, environmental equipment |
![Boiler](/images/citiwaste-1.jpg)
City waste Fired CFBC Boiler of 50 ton/h 52 bar 400 °C superheated steam |
![Boiler](/images/turbine-hangzhou.jpg)
Turbine of 10 MW made in by Hangzhou Turbine Works (technical assistance
from SIEMENS) |
![Boiler](/images/jinjiang.jpg)
Mr. K. Hamada of Hamada Boiler (left back row) posing with Jinjiang Group
of Hangzhou (front left) discussing project to expand City Waste power
Plant in many privinces of China |