City Waste Power Plant with Fluidized Bed Boiler

| Home |

200 m3 per day city waste POWER PLANT 10 MW
Boiler
1st power plant of city waste was built in 1997 in Hangzhou

City garbage waste are collected to be used for power plant
Boiler
At the back of the boiler, environmental equipment
Boiler
City waste Fired CFBC Boiler of 50 ton/h 52 bar 400 °C superheated steam
Boiler
Turbine of 10 MW made in by Hangzhou Turbine Works (technical assistance from SIEMENS)
Boiler
Mr. K. Hamada of Hamada Boiler (left back row) posing with Jinjiang Group of Hangzhou (front left) discussing project to expand City Waste power Plant in many privinces of China
 