Coal mining is a major industry in Kalimantan. There are so many mining
site with coal washing process to produce export quality coal for world
market. Many of them have capacity to process about 2,000,000 ton of
coal every year. It is important to be noted that 5% of the total coal
processed will go to the waste sludge-settling pond. For every coal
mining company, this 5% waste is a total loss and recorded in their
accounting book as loss. Every 3-5 days, fine particle waste coal settled
in the pond must be removed by the use of heavy equipment and dump
trucks to be filed at the backyard. This waste coal sludge is becoming
serious problem to all companies with coal washing. Design fuel is
coal-sludge from coal washing process. 35 ton/h boiler can be coupled
with 6000 KW condensing steam turbine or used for industrial process.
Boiler can burn 100,000 tons of coal sludge each year. Special technology
in handling fine particle of coal sludge **Fine
particle coal sludge will have to be processed to shape of cylinder.
Shaped coal sludge will be fed from the top of the furnace and drop
into the fluidizing bed. As it is being shaped, fine particle will
not be carried away by the induced draft in the furnace until the mass
will touch down to the fluidizing bed. Once shaped mass will sink down
to the bed, it will automatically be dispersed in the moving bed effect.
**Fly ash can be fed to the furnace again for refiring. **Non-overflow
operating technique of bed material is used to keep the stability of
fluidized bed.
Message to all coal mining companies
worldwide
We expect to receive inquiry from you on this
very special coal sludge fluidized bed boiler we have successfully
developed. Please contact us for further details by e-mail |