MODEL |
CB3-34RF |
CB3-56RF |
CB3-78RF |
CB3-9010RF |
CB3-1112RF |
|
|
(Single Pulverizer) |
(Single Pulverizer) |
(Single Pulverizer) |
(Double Pulverizer) |
(Double Pulverizer) |
1 |
MAX. CAPACITY |
30-40 tons/H |
50-60 tons/H |
70-80 tons/H |
90-100 tons/H |
110-120 tons/H |
2 |
MAX. THERMAL HEAT |
4,300,000 Kcal/H |
6,500,000 Kcal/H |
8,600,000 Kcal/H |
10,800,000 Kcal/H |
13,000,000 Kcal/H |
3 |
PULVERIZER CAPACITY |
600 - 900 kgs/H |
1,000 - 1200 kgs/H |
1,400 - 1600 kgs/H |
1,800 - 2,000 kgs/H |
2,200 - 2400 kgs/H |
4 |
COAL CONSUMPTION |
18 - 25 kgs/ton |
18 - 25 kgs/ton |
18 - 25 kgs/ton |
18 - 25 kgs/ton |
18 - 25 kgs/ton |
5 |
FURNACE TYPE |
Rotary w/ Louver Airbox |
Rotary w/ Louver Airbox |
Rotary w/ Louver Airbox |
Rotary w/ Louver Airbox |
Rotary w/ Louver Airbox |
6 |
PULVERIZER MOTOR |
30 KW |
37 KW |
45 KW |
30 KW X 2 |
37 KW X 2 |
7 |
COAL CRUSHER MOTOR |
7.5 KW |
7.5 KW |
11 KW |
11 KW |
11 KW |
8 |
FORCED FAN MOTOR |
7.5 KW |
11 KW |
15 KW |
15 KW |
15 KW |
9 |
DRIVE GEARMOTOR |
1.5 KW |
1.5 KW |
2.2 KW |
2.2 KW |
2.2 KW |
10 |
CONVEYOR MOTOR |
1.5 KW |
1.5 KW |
2.2 KW |
2.2 KW |
2.2 KW |
11 |
COAL LIFTER MOTOR |
2.2 KW |
2.2 KW |
2.2 KW |
2.2 KW |
2.2 KW |
12 |
COAL FEEDER MOTOR |
0.75 KW |
0.75 KW |
0.75 KW |
0.75 KW |
0.75 KW |
13 |
START-UP BURNER |
0.37 KW |
0.37 KW |
0.37 KW |
0.37 KW |
0.37 KW |
|
SCOPE OF SUPPLY:
- ROTARY FURNACE COMPLETE W/ REFRACTORY WORKS, WHEELED ROLLERS, CHAIN-DRIVE BY GEARMOTOR.
- COMBUSTION AIRBOX, LOUVER-TYPE, ADJUSTABLE WHEEL, STRUCTURE & FORCED DRAFT FAN
- MAIN PULVERIZER WITH MOTOR, SCREW FEEDER WITH GEARMOTOR, BASE PLATE, ETC.
- COAL CRUSHER WITH MOTOR WITH DISCHARGE SCREW, COMPLETE WITH BASE FRAME & STRUCTURE
- ELEVATED COAL SILO, COMPLETE WITH STRUCTURE & CLIMBING LADDER
- COAL LIFTER, 300 KGS/LIFT, DRIVEN BY GEAR MOTOR WITH DOUBLE WINCH DRUM
- COAL CONVEYOR WITH RECEIVING HOPPER, DRIVEN BY GEARMOTOR
- START-UP BURNER ASSEMBLY
- CONTROL PANEL WITH CONTROLLER
- THERMOCOUPLE SENSOR & CABLING
- SITE ELECTRICAL WIRES & CABLES
- INCLUDING INSTALLATION & COMMISSIONING
*NOTE: ABOVE PRICES DOES NOT INCLUDE FOUNDATION AND ALL CIVIL WORKS
|
|